Summarised financial information

Summarised financial information and other

The summarised financial information for the year ended 31 December 2014 were approved on 19 March 2015 by the AngloGold Ashanti Board of Directors and were signed on its behalf by the Chairman, Sipho Pityana, the Chairman of the Audit and Risk Committee, Rhidwaan Gasant, Chief Executive Officer, Srinivasan Venkatakrishnan, and Chief Financial Officer, Christine Ramon.

Basis of preparation

The summarised consolidated financial results for the year ended 31 December 2014 have been prepared in accordance with International Accounting Standard 34 “Interim Financial Reporting”, the Listings Requirements of the JSE Limited, Financial Reporting Guides as issued by the South African Institute of Chartered Accountants and the South African Companies Act No. 71 of 2008, as amended.

Accounting policies are prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board. The financial statements have been drawn up on the basis of accounting standards, interpretations and amendments effective at the beginning of the accounting period on 1 January 2014. AngloGold Ashanti Limited is in the process of assessing the significance of new standards, interpretations or amendments to standards in issue that are not yet adopted.

These summarised consolidated financial results do not include all the information required for complete annual financial statements prepared in accordance with IFRS, and have been prepared according to the historical cost accounting convention, except for the revaluation of certain financial instruments to fair value. The group’s accounting policies are consistent in all material respects with those applied in the previous year.

INDEPENDENT AUDIT BY THE AUDITORS

These summarised consolidated financial results for the year ended 31 December 2014 have been extracted from the complete set of annual financial statements on which the auditors, Ernst & Young Inc., has expressed an unqualified audit opinion. The auditor’s opinion and annual financial statements are available for inspection at the registered office of the company.

RELATED PARTY TRANSACTIONS

The group, in the ordinary course of business, entered into various sale and purchase transactions with related parties. Related parties include directors and prescribed officers as members of key management personnel.

Compensation to directors and other key management personnel includes the following:

Figures in million (US dollars) 2014 2013 2012
Related parties   
Short-term employee benefits131517
Post-employment benefits312
Share-based payments359
 192128

SIGNIFICANT CHANGES IN CONTINGENCIES SINCE 31 DECEMBER 2013

By their nature, contingencies will only be resolved when one or more future events occur or fail to occur. The assessment of such contingencies inherently involves the exercise of significant judgement and estimates of the outcome of future events. Such contingencies include, but are not limited to, environmental obligations, litigation, regulatory proceedings, tax matters and losses resulting from other events and developments.

Firstly, when a loss is considered probable and reasonably estimable, a liability is recorded in the amount of the best estimate for the ultimate loss. The likelihood of a loss with respect to a contingency can be difficult to predict and determining a meaningful estimate of the loss or a range of loss may not always be practicable based on the information available at the time and the potential effect of future events and decisions by third parties that will determine the ultimate resolution of the contingency. It is not uncommon for such matters to be resolved over many years, during which time relevant developments and new information is continuously evaluated to determine both the likelihood of any potential loss and whether it is possible to reasonably estimate a range of possible losses. When a loss is probable but a reasonable estimate cannot be made, disclosure is provided.

In determining the threshold for disclosure on a qualitative and quantitative basis, management considers the potential for a disruptive effect on the normal functioning of the group and/or whether the contingency could impact investment decisions. Such qualitative matters considered are reputational risks, regulatory compliance issues and reasonable investor considerations. For quantitative purposes an amount of $20m, has been considered.

Litigation and other judicial proceedings as a rule raise difficult and complex legal issues and are subject to uncertainties and complexities including, but not limited to, the facts and circumstances of each particular case, issues regarding the jurisdiction in which each suit is brought and differences in applicable law. Upon resolution of any pending legal matter, the group may be forced to incur charges in excess of the presently established provisions and related insurance coverage. It is possible that the financial position, results of operations or cash flows of the group could be materially affected by the unfavourable outcome of litigation.

Occupational Diseases in Mines and Works Act (ODMWA) litigation – On 3 March 2011, in Mankayi vs. AngloGold Ashanti, the Constitutional Court of South Africa held that section 35(1) of the Compensation for Occupational Injuries and Diseases Act, 1993 does not cover an “employee” who qualifies for compensation in respect of “compensable diseases” under the Occupational Diseases in Mines and Works Act, 1973 (ODMWA). This judgement allows such qualifying employee to pursue a civil claim for damages against the employer. Following the Constitutional Court decision, AngloGold Ashanti has become subject to numerous claims relating to silicosis and other Occupational Lung Diseases (OLD), including several potential class actions and individual claims.

AngloGold Ashanti, Anglo American South Africa, Gold Fields, Harmony Gold and Sibanye Gold announced in November 2014 that they have formed an industry working group to address issues relating to compensation and medical care for OLD in the gold mining industry in South Africa. The companies have begun to engage all stakeholders on these matters, including government, organised labour, other mining companies and legal representatives of claimants who have filed legal suits against the companies. These legal proceedings are being defended, and the status of the proceedings are set forth below. Essentially, the companies are seeking a comprehensive solution which deals both with the legacy compensation issues and future legal frameworks, and which, whilst being fair to employees, also ensures the future sustainability of companies in the industry.

From August 2012 to August 2013, the company was served with various class actions relating to silicosis including the “Balakazi Action” and “the Nkala Action”. In the event the classes are certified, such class of workers would be permitted to institute actions by way of a summons against AngloGold Ashanti for amounts as yet unspecified. The parties in the class actions met with the court and have tentatively agreed on a timetable for the court process wherein the application to certify the class action will be heard in October 2015.

From October 2012 to April 2014, the company received a total of 1,256 individual summonses and particulars of claim relating to silicosis and/or other OLD. The total amount claimed in the 1,256 summonses is approximately $192 million as at the 31 December 2014 closing rate. On 9 October 2014, AngloGold Ashanti and the plaintiffs’ attorneys agreed to refer all of the individual claims to arbitration. The court proceedings have been suspended as a result of entering into the arbitration agreement.

It is possible that additional class actions and/or individual claims relating to silicosis and/or other OLD will be filed against AngloGold Ashanti in the future. AngloGold Ashanti will defend all current and subsequently filed claims on their merits. Should AngloGold Ashanti be unsuccessful in defending any such claims, or in otherwise favourably resolving perceived deficiencies in the national occupational disease compensation framework that were identified in the earlier decision by the Constitutional Court, such matters would have an adverse effect on its financial position, which could be material. The company is unable to reasonably estimate its share of the amounts claimed.

Sales tax on gold deliveries – In 2006, Mineração Serra Grande S.A. (MSG) received two tax assessments from the State of Goiás related to the payments of state sales taxes at the rate of 12% on gold deliveries for export from one Brazilian state to another during the period from February 2004 to the end of May 2006. The first and second assessments were approximately $62m and $39m as at 31 December 2013 and $96m and $60m as at 31 December 2012, respectively. Various legal proceedings have taken place over the years with respect to this matter, as previously disclosed. On 5 May 2014, the State of Goiás published a law which enables companies to settle outstanding tax assessments of this nature. Under this law, MSG settled the two assessments in May 2014 by paying $14m in cash and by utilising $29m of existing VAT credits. The utilisation of the VAT credits is subject to legal confirmation from the State of Goiás. Although the State has not yet provided confirmation, management has concluded that the likelihood of the State of Goiás declining the utilisation of the VAT credits or part thereof is remote. The cash settlement was further set off by an indemnity from Kinross of $6m.

Royalty – As a result of the sale of Navachab during the second quarter of 2014, AngloGold Ashanti will receive a net smelter to return paid quarterly for seven years from 1 July 2016, determined at 2% of ounces sold during the relevant quarter subject to a minimum average gold price of $1,350 and capped at a maximum of 18,750 ounces sold per quarter.

USE OF ESTIMATES

The preparation of the financial statements requires the group’s management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities, at the date of the financial statements, and the reported amounts of revenues and expenses during the reporting period. The determination of estimates requires the exercise of judgement based on various assumptions and other factors such as historical experience, current and expected economic conditions, and in some cases actuarial techniques. Actual results could differ from those estimates.

The more significant areas requiring the use of management estimates and assumptions relate to the Ore Reserve as the basis of future cash flow estimates and unit-of-production depreciation, depletion and amortisation calculations; environmental, reclamation and closure obligations; estimates of recoverable gold and other materials in heap leach pads; asset impairments/reversals (including impairments of goodwill); and write-downs of inventory to net realisable value: other estimates include post-employment, postretirement and other employee benefit liabilities; and deferred taxation.

Estimates and judgements are continually evaluated and are based on historical experience and other factors, including expectations of future events that are believed to be reasonable under the circumstances.

As a global company, the group is exposed to numerous legal risks. The outcome of currently pending and future proceedings cannot be predicted with certainty. Thus, an adverse decision in a lawsuit could result in additional costs that are not covered, either wholly or partly, under insurance policies and that could significantly influence the business and results of operations.

The judgements that management has applied in the application of accounting policies, and the estimates and assumptions that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year, are discussed below.

Carrying value of goodwill and tangible assets

The majority of mining assets are amortised using the units-of-production method where the mine operating plan calls for production from a well-defined proved and probable Ore Reserve.

For mobile and other equipment, the straight-line method is applied over the estimated useful life of the asset which does not exceed the estimated mine life based on proved and probable Ore Reserve as the useful lives of these assets are considered to be limited to the life of the relevant mine.

The calculation of the units-of-production rate of amortisation could be impacted to the extent that actual production in the future is different from current forecast production based on proved and probable Ore Reserve. This would generally arise when there are significant changes in any of the factors or assumptions used in estimating Ore Reserve.

These factors could include:

  • changes in proved and probable Ore Reserve;
  • the grade of Ore Reserve may vary significantly from time to time;
  • differences between actual commodity prices and commodity price assumptions;
  • unforeseen operational issues at mine sites; and
  • changes in capital, operating, mining, processing and reclamation costs, discount rates and foreign exchange rates.

Changes in proved and probable Ore Reserve could similarly impact the useful lives of assets amortised on the straight-line method, where those lives are limited to the life of the mine.

The group has a number of surface mining operations that are in the production phase for which production stripping costs are incurred. The benefits that accrue to the group as a result of incurring production stripping costs include (a) ore that can be used to produce inventory and (b) improved access to further quantities of material that will be mined in future periods.

The production stripping costs relating to improved access to further quantities in future periods are capitalised as a stripping activity asset, if and only if, all of the following are met:

  • It is probable that the future economic benefit (improved access to the ore body) associated with the stripping activity will flow to the group;
  • The group can identify the component of the ore body for which access has been improved; and
  • The costs relating to the stripping activity associated with that component or components can be measured reliably.

Components of the various ore bodies at the operations of the group are determined based on the geological areas identified for each of the ore bodies and are reflected in the Ore Reserve reporting of the group. In determining whether any production stripping costs should be capitalised as a stripping activity asset, the group uses three operational guidance measures; two of which relate to production measures, while the third relates to an average stripping ratio measure.

Once determined that any portion of the production stripping costs should be capitalised, the group uses the average stripping ratio of the component or components to which the production stripping costs relate to determine the amount of the production stripping costs that should be capitalised. Stripping activity assets are amortised on the units-of-production method based on the Ore Reserve of the component or components of the ore body to which these assets relate.

This accounting treatment is consistent with that for stripping costs incurred during the development phase of a mine, before production commences, except that stripping costs incurred during the development phase of a mine, before production commences, are amortised on the units-of-production method based on the Ore Reserve of the life of the mine as a whole.

Deferred stripping costs are included in ‘Mine development costs’, within tangible assets. These costs form part of the total investment in the relevant cash-generating unit, which is reviewed for impairment if events or a change in circumstances indicate that the carrying value may not be recoverable. Amortisation of stripping activity assets is included in operating costs.

An individual operating mine is not a typical going-concern business because of the finite life of its reserves. The allocation of goodwill to an individual mine will result in an eventual goodwill impairment due to the wasting nature of the mine reporting unit. In accordance with the provisions of IAS 36 “Impairment of Assets”, the group performs its annual impairment review of assigned goodwill during the fourth quarter of each year.

The group reviews and tests the carrying value of tangible assets when events or changes in circumstances suggest that the carrying amount may not be recoverable. Assets are grouped at the lowest level for which identifiable cash flows are largely independent of cash flows of other assets. If there are indications that impairment may have occurred, estimates are prepared of expected future cash flows for each group of assets. Expected future cash flows used to determine the value in use of goodwill and tangible assets are inherently uncertain and could materially change over time and impact the recoverable amounts. The cash flows and value in use are significantly affected by a number of factors including published reserves, resources, exploration potential and production estimates, together with economic factors such as spot and future gold prices, discount rates, foreign currency exchange rates, estimates of costs to produce reserves and future capital expenditure. Refer note 15 for estimates and assumptions used to calculate recoverable amounts. In addition the group considers the reversal of previously recognised impairments at each reporting date. At the reporting date the group assesses whether any of the indicators which gave rise to previously recognised impairments have changed such that the impairment loss no longer exists or may have decreased. The impairment loss is then assessed on the original factors for reversal and if indicated, such reversal is recognised.

The recoverable amount is estimated based on the positive indicators. If an impairment loss has decreased, the carrying amount is recorded at the recoverable amount as limited in terms of IAS 36.

The carrying amount of goodwill in the consolidated financial statements at 31 December 2014 was $142m (2013: $154m; 2012: $195m). The carrying amount of tangible assets at 31 December 2014 was $4,863m (2013: $4,815m; 2012: $7,776m). The impairment and derecognition of goodwill and tangible assets recognised in the consolidated financial statements for the year ended 31 December 2014 were nil (2013: $15m; 2012: nil) and $4m (2013: $2,978m; 2012: $356m) respectively.

Income taxes

The group is subject to income taxes in numerous jurisdictions. Significant judgement is required in determining the worldwide provision for income taxes due to the complexity of legislation. There are many transactions and calculations for which the ultimate tax determination is uncertain during the ordinary course of business. The group recognises liabilities for anticipated tax audit issues based on estimates of whether additional taxes will be due. Where the final tax outcome of these matters is different from the amounts that were initially recorded, such differences will impact the income tax and deferred tax provisions in the period in which such determination is made.

The group recognises the net future tax benefit related to deferred income tax assets to the extent that it is probable that the deductible temporary differences will reverse in the foreseeable future. Assessing the recoverability of deferred income tax assets requires the group to make significant estimates related to expectations of future taxable income. Estimates of future taxable income are based on forecast cash flows from operations and the application of existing tax laws in each jurisdiction. To the extent that future cash flows and taxable income differ significantly from estimates, the ability of the group to realise the net deferred tax assets recorded at the reporting date could be impacted.

Additionally, future changes in tax laws in the jurisdictions in which the group operates could limit the ability of the group to obtain tax deductions in future periods.

Carrying values of the group at 31 December 2014:

  • deferred tax asset: $127m (2013: $177m; 2012: $97m);
  • deferred tax liability: $567m (2013: $579m; 2012: $1,084m);
  • taxation liability: $66m (2013: $81m; 2012: $120m); and
  • taxation asset: $25m (2013: $51m; 2012: $54m).

Unrecognised value of deferred tax assets: $563m (2013: $414m; 2012: $89m).

Provision for environmental rehabilitation obligations

The group’s mining and exploration activities are subject to various laws and regulations governing the protection of the environment. The group recognises management’s best estimate for decommissioning and restoration obligations in the period in which they are incurred. Actual costs incurred in future periods could differ materially from the estimates. Additionally, future changes to environmental laws and regulations, life of mine estimates, foreign currency exchange rates and discount rates could affect the carrying amount of this provision.

The carrying amount of the rehabilitation obligations for the group at 31 December 2014 was $851m (2013: $728m; 2012: $841m).

Stockpiles, metals in process and ore on leach pad

Costs that are incurred in or benefit the production process are accumulated as stockpiles, metals in process and ore on leach pads. Net realisable value tests are performed at least annually and represent the estimated future sales price of the product, based on prevailing and long-term metals prices, less estimated costs to complete production and bring the product to sale.

Stockpiles and underground metals in process are measured by estimating the number of tonnes added and removed from the stockpile and from underground, the number of contained gold ounces based on assay data, and the estimated recovery percentage based on the expected processing method. Stockpile and underground ore tonnages are verified by periodic surveys.

Estimates of the recoverable gold on the leach pads are calculated from the quantities of ore placed on the pads based on measured tonnes added to the leach pads, the grade of ore placed on the leach pads based on assay data and a recovery percentage based on metallurgical testing and ore type.

Although the quantities of recoverable metal are reconciled by comparing the grades of ore to the quantities of gold actually recovered (metallurgical balancing), the nature of the process inherently limits the ability to precisely monitor recoverability levels. As a result, the metallurgical balancing process is constantly monitored and engineering estimates are refined based on actual results over time.

Variations between actual and estimated quantities resulting from changes in assumptions and estimates that do not result in writedowns to net realisable value are accounted for on a prospective basis.

The carrying amount of inventories (excluding finished goods and mine operating supplies) for the group at 31 December 2014 was $1,106m (2013: $1,125m; 2012: $1,309m).

Ore Reserve estimates

An Ore Reserve estimate is an estimate of the amount of product that can be economically and legally extracted from the group’s properties. In order to calculate Ore Reserve, estimates and assumptions are required about a range of geological, technical and economic factors, including quantities, grades, production techniques, recovery rates, production costs, transport costs, commodity demand, commodity prices and exchange rates.

Estimating the quantity and/or grade of Ore Reserve requires the size, shape and depth of ore bodies to be determined by analysing geological data such as the logging and assaying of drill samples. This process may require complex and difficult geological judgements and calculations to interpret the data. The group is required to determine and report Ore Reserve in accordance with the SAMREC code.

Because the economic assumptions used to estimate the changes in Ore Reserve from period to period, and because additional geological data is generated during the course of operations, estimates of Ore Reserve may change from period to period. Changes in reported Ore Reserve may affect the group’s financial results and financial position in a number of ways, including the following:

  • asset carrying values may be affected due to changes in estimated future cash flows;
  • depreciation, depletion and amortisation charged in the income statement may change where such charges are determined by the units-of-production method, or where the useful economic lives of assets change;
  • overburden removal costs, including production stripping activities, recorded on the statement of financial position or charged in the income statement may change due to changes in stripping ratios or the units-of-production method of depreciation;
  • decommissioning site restoration and environmental provisions may change where changes in the estimated Ore Reserve affect expectations about the timing or cost of these activities; and
  • the carrying value of deferred tax assets may change due to changes in estimates of the likely recovery of the tax benefits.

SUMMARY OF MINERAL RESOURCE AND ORE RESERVE

Mineral Resource

The total Mineral Resource decreased from 233.0 million ounces (Moz) in December 2013 to 232.0Moz in December 2014. A gross annual increase of 8.7Moz occurred before depletion and disposals, while the net decrease after allowing for depletion and disposal was 1.0Moz. Changes in economic assumptions from December 2013 to December 2014 resulted in a 6.4Moz decrease to the Mineral Resource, while exploration and modelling resulted in an increase of 14.4Moz. Depletion from the Mineral Resource for the year totalled 5.9Moz and reduction from the sale of Navachab, 3.8M0z. The Mineral Resource has been estimated at a gold price of US$1,600/oz (2013: US$1,600/oz).

Ore Reserve

The AngloGold Ashanti Ore Reserve reduced from 67.9Moz in December 2013 to 57.5Moz in December 2014. This gross annual decrease of 10.5Moz includes depletion of 4.9Moz and the sale of Navachab of 1.9Moz. The remaining reduction of 3.7Moz in Ore Reserve resulted from changes to the economic assumptions between 2013 and 2014 which resulted in a reduction of 3.0Moz to the Ore Reserve, while exploration and modelling changes led to a further decrease of 0.7Moz. The Ore Reserve has been estimated using a gold price of US$1,100/oz (2013: US$1,100/oz).